Water of Life: Mudeka Well Construction Reaches Final Phase Eau de Vie : La construction du forage de Mudeka entre dans sa phase finale
We are thrilled to share that the Care Relief Association borehole drilling crew has struck high-quality groundwater at a depth of 75 meters in Mudeka village. For generations, the children and women of Mudeka had to walk up to 3 kilometers daily to draw water from seasonal streams which were often contaminated.
Thanks to our generous donors, the main solar-powered pumping structure is now installed. This week, we commenced construction of the elevated 10,000-liter storage tank and community tap stands. Crucially, we have trained a local 5-member Water Committee (comprising three women and two men) on preventative maintenance, tariff collection, and hygiene sanitation practices to ensure long-term sustainability.
Nous sommes ravis d’annoncer que l’équipe de forage de la Care Relief Association a trouvé une eau souterraine de haute qualité à une profondeur de 75 mètres dans le village de Mudeka. Depuis des générations, les enfants et les femmes de Mudeka devaient parcourir jusqu’à 3 kilomètres par jour pour puiser de l’eau dans des ruisseaux saisonniers souvent contaminés.
Grâce à nos généreux donateurs, la structure de pompage solaire principale est installée. Cette semaine, nous avons commencé la construction du réservoir de stockage surélevé de 10 000 litres et des rampes de distribution communautaires. De plus, nous avons formé un comité de l’eau composé de 5 membres locaux (trois femmes et deux hommes) pour assurer la maintenance préventive et l’hygiène, garantissant une durabilité à long terme.